Špindlerův Mlýn

Audi Line Přehradní chairlift

New lift, 2026/27·Špindlerův Mlýn·€€

Opening December 2026

About Audi Line Přehradní chairlift

The first stage of the resort’s Connections project, planned to open in December 2026: the six-seat Audi Line Přehradní chairlift from the P1 terminal by the Elbe dam to the top of Hromovka, about 1.4 km long, carrying up to 2,000 people an hour in about four minutes, with the new red Přehradní run beside it and the Lesní run arriving over a new bridge. In 2026/27 the link runs one way, from Medvědín to Svatý Petr; a ten-seat gondola from P1 to Medvědín, planned for 2027/28, will make it two-way.

Why it's on our list

  • Heated seats and bubbles
  • Up to 2,000 people an hour
  • Skis from Medvědín to Svatý Petr

Opening hours, prices and seasonal openings change, so please check with Audi Line Přehradní chairlift before you go.

Location

The ULTIMATE letter

The mountains in your inbox

An occasional email with season openings, new places, resort guides and our latest in-depth features. No spam, ever.